Application & Deal Type
Select the application and commercial structure. This controls which fields, products, terms, and scope items appear throughout the tool.
Application
Deal Structure
Cover Page
This information appears on the proposal cover page.
Prepared For (Client)
Prepared By (Moleaer)
Plant & Project Details
Describe the customer's plant and the challenges they face.
Plant & Project Details
Fill in each section below. These map directly to subheadings in the proposal. Use the "Generate with Claude" button to get a draft for any section, or write your own.
This will also feed into the Executive Summary at the end.
This will auto-fill the Installation Placement field in Solution Strategy.
Prompt copied to clipboard! Paste it into Claude.ai, then paste the result below.
Tip: Paste plain text here. Add bold, bullets, or other formatting in Word after export.
Objectives & Key Performance Indicators
Define the primary and optional secondary KPIs for this project.
Final KPI targets to be refined following baseline data collection, historical performance review, and alignment on monitoring methodology.
Primary KPIs
| Process Unit | Objective | KPI Target | Measurement | |
|---|---|---|---|---|
Include Secondary KPIs
Proposed Solution Strategy
Select equipment and describe the proposed solution.
Equipment Selection
Select quantities for each model. Products shown are based on the application selected in Step 1. Toggle between Imperial and Metric units.
Units:
Select an application in Step 1 to see available products.
Auto-populated from selections above. Edit freely if needed.
Compressed Air
Customer supplies their own compressor
If yes, document adds the 0.01 micron filtration and auto-blowdown valve requirement.
Problem It Solves
Pre-filled based on application selection. Edit freely for this project.
Material Selection
NanoShield Inline Material:
Solution Details
Auto-filled from the Nanobubble Generator Placement field in Plant & Project Details.
Prompt copied to clipboard! Paste it into Claude.ai, then paste the result below.
Tip: Paste plain text here. Add bold, bullets, or other formatting in Word after export.
Scope of Work & Responsibilities
Standard boilerplate items are shown below. Equipment Scope of Supply and Installation Support are editable. Other items can be adjusted in the exported Word document if needed.
Main Responsibilities
| Task | Customer | Moleaer |
|---|---|---|
| Establish Baseline Historical Performance Data | Provide baseline historical data for past 3 years in Excel format | Evaluate data to present metrics, trends, and establish baseline |
| Equipment Scope of Supply (editable) |
||
| Installation of Equipment | All installation labor: electrical, plumbing, and mechanical | Provide startup guidance to ensure project success |
| Operation & Maintenance of Equipment | Day-to-day operation Perform daily/weekly inspections and record flows and pressures Perform CIP as indicated by air pressure increase, at minimum monthly |
Startup visit (half-day) once power and piping are complete Train customer on CIP procedures and system operations |
| Data Acquisition and Review | Continued operational data acquisition for review by Moleaer team | Review data and discuss results with customer regularly |
| Process Optimization | Collaborate with Moleaer to discuss process optimization options and execute the changes | Collaborate with customer and recommend changes to the plant operations to optimize the performance |
Installation Details
| Item | Requirement |
|---|---|
| Discharge Lines | Must be fully submerged, at least two feet below the waterline, and oriented at a 90-degree angle to the tank or channel floor to avoid excessive turbulence |
| Portal Flow Meter | If used, follow the manufacturer's straight-pipe run requirements for accurate readings |
| Installation Support & Service Visits from Moleaer (editable) |
System Operation Requirements
| Component | Requirements |
|---|---|
| Compressed Air (If Customer Provided) | Must meet ISO 8573-1:2010 Class 4 air purity standards: clean, dry, and oil-free Requires filtration to 0.01 micron and an auto-blowdown valve |
| Screening | Wastewater fed to the nanobubble generator must be screened to remove debris Must be a fine screen with openings no larger than 0.25 inches (6 mm) Grinders, chopper pumps, or suction from downstream of an overflow weir are acceptable alternatives |
| Pump (If Customer Provided) | Use a 120V or 24V control signal to activate gas supply and tie the gas shutoff to the pump stop Equip the pump with high-head protection against valve closures or blockages Install a clamp-on ultrasonic flow meter on the discharge line if possible |
| Weather Protection | Compressed air lines must be insulated or heat-traced to prevent condensate or freezing Compressors and control equipment need to be housed in a climate-controlled or weatherproof enclosure Moleaer is not responsible for performance issues resulting from inadequate weather protection |
Pricing & Commercial Terms
Set pricing and commercial terms. The summary box updates as you type.
Auto-set based on currency selection.
Auto-set from Application & Deal selection.
Lease Terms
Auto-set based on application and deal type.
$
$
$
Additional Line Items
Add service visits, shipping, installation support, or any other items.
| Item | Description | Price | |
|---|---|---|---|
/mo |
Pricing Summary
No pricing entered yet
Executive Summary
This is auto-populated from information you entered in previous steps. Use "Generate with Claude" for a polished paragraph, or write your own.
Auto-filled from your entries
Complete earlier steps to see a preview here.
Review & Adjust (these feed the Claude prompt)
Pulled from Plant & Project Details. Edit if needed for the summary.
Pulled from Equipment Selection.
Pulled from Pricing & Terms.
Pulled from deal type and lease terms.
Prompt copied to clipboard! Paste it into Claude.ai, then paste the result below.
Tip: Paste plain text here. Add bold, bullets, or other formatting in Word after export.
Export
Your proposal is ready. Click Export to download.
Word Template
⚠
Loading template...
Use a different template file
Override the built-in template with your own .docx file.
📄
Proposal - [Project Name].docx
Exported using your original Word template with all formatting preserved
What's included in the export:
- Cover page with project name, date, client/Moleaer info
- Executive Summary
- Plant & Project Details
- Objectives & KPIs tables
- Proposed Solution Strategy (with equipment details)
- Scope of Work & Responsibilities tables
- Pricing & Commercial Terms (with full rate breakdown)
- Terms & Conditions (from the original template)